Skip to content
YibudYibud

Before you treat a 30-day onboarding as proof of fit

Time to Value for Startups: write the first-outcome clock as a pre-written onboarding tripwire

A slide that prints “onboarding is done” without naming the start event, the first real outcome, or what you will do if the clock misses is not validation. Time to Value asks a smaller, honester question: how long until this customer gets a named first result — against a bar you wrote before you measured the cohort? Matching it is a decision signal. It is not a forecast that you will succeed, and not a substitute for naming the weakest demand assumption first.

Last updated: November 1, 2026

Direct answer

What is Time to Value — and why write the tripwire first?

Time to Value (TTV) is the elapsed time from a named start event — contract signed, account provisioned, or first login / signup — to the first named, observable customer outcome. It is first value, not full value. It answers “how long until they get a real result,” not “will we succeed.” Write the tripwire before you look: “for cohort or segment S as-of date D, median (or p75) TTV to [named first outcome] must stay ≤ X days (or we stop scaling acquisition / fix provisioning / cut onboarding scope / change ICP).” Hitting or missing it is a decision signal — not a prediction of success.

Key takeaways

What to remember

  • First value is not full value. Bessemer Atlas (Gabe Miller-Smith, then SVP of Global Customer Success at Procore; 29 August 2023) records Procore measuring time to first value, not full value — kickoff plus formal implementation plus hours of training were the old path. Write the stop-clock outcome as one observable result (first campaign sent, first dashboard with live data, first workflow live), not “successfully onboarded.”
  • Name the start clock. Contract signed, account provisioned, and first login are different sittings. Gabe’s Procore vignette includes a provisioning delay: manual access took 7 days. When both matter, keep two clocks — provision delay, then time-from-access-to-first-outcome. Do not hide a week in the queue inside a blended “TTV.”
  • Year-one churn often means too much discounting at the outset or time-to-value too long (Gabe / Bessemer, 29 August 2023). Years three and beyond often mean weak upsell / value delivery, or a misunderstood segment — including a willingness to downsell. One sentence on timing. The logo-count bands live on the logo-churn page; this page owns the clock.
  • Gainsight’s own sitting (Ashvin Vaidyanathan, 21 September 2020; results attributed to process changes in Q1’21) is time to launch of the customer’s Gainsight implementation, not a product-level first-click. After analyzing 1000+ implementations they cut average time to launch from 13 weeks to 4 weeks; the fastest lasting nine days. They frame that 13→4 drop as “66%.” Use their numbers as their operational clock, not as a universal SaaS law.
  • Write the tripwire before you measure: as-of date + segment + start event + named first outcome + statistic (median or p75) + threshold + named action (stop paid acquisition for that segment / automate provisioning / cut scope to a phased first launch / stop selling the segment). A Yibud score is not TTV and not a success prediction. Pre-product, do not “optimize TTV” by starving discovery.

Why it matters

Why an “onboarded” checkbox can still hide a late first result

Founders treat a kickoff meeting or a setup-wizard check as the whole story. A completed checklist is not a customer outcome. Two sittings are useful here as instruments, not as personal odds: Gabe’s Procore first-value clock on Bessemer Atlas, and Gainsight’s published time-to-launch cut.

Year-one cancels often arrive before anyone named “value”

Gabe’s timing note: lots of year-one churn often means discounting too much at the outset or taking too long to get customers to value. If you cannot name the first observable outcome, you cannot tell those two causes apart. A cancel at month ten with no first dashboard is a different sitting from a cancel after they already ran a live workflow.

A provision queue can eat the clock before the product even starts

Gabe’s Procore vignette: manual provisioning took 7 days to give customers access. If you start the clock at contract signed and never split that queue, you will “optimize TTV” by yelling at CS while engineering still grants seats by hand. Separate the delay you own from the delay the customer owns after they can log in.

A launch clock is not automatically a first-outcome clock

Gainsight reports time to launch of their implementation — 13 weeks down to 4, fastest nine days — after a Configuration Wizard and phased launches. That is their operational sitting. A product-level first-outcome TTV (first campaign sent, first live dashboard) can be shorter or longer than “the implementation launched.” Label which clock you meant before you compare yourself to their 4 weeks.

The five terms

First vs full value, start clock, stop clock, TTV vs logo churn, TTV vs retention

These five fields are the instrument. If any one is fuzzy, the day-count is a slide, not a tripwire. This page does not publish a “good TTV is X days for all SaaS” table. The only dated figures here are Gabe’s Procore sitting and Gainsight’s time-to-launch sitting.

First value ≠ full value

Gabe’s Procore vignette measured time to first value, not full value. The old path was kickoff plus formal implementation plus hours of training — a long road that kept customers waiting for a complete picture. First value is the first named, observable result the customer can point at. Full value is later: more seats, more workflows, more modules. Do not start the tripwire on “they are fully rolled out.”

Start clock — say which start you use

Contract signed, account provisioned, and first login / signup are three different starts. Write which one you meant before the first cohort. Gabe’s vignette includes a 7-day manual access delay; automating provisioning plus a setup wizard let customers begin using and customizing right away. If provision delay and time-from-access both matter, keep both clocks. Do not blend them after a miss.

Stop clock — one named, observable outcome

Pick one: first campaign sent, first dashboard with live data, first workflow live. Not “successfully onboarded.” Not “attended kickoff.” Not “clicked around.” If two people on your team would score the same customer differently, you have not named the stop. The statistic (median or p75) is a compression; the named outcome is the sitting.

TTV vs logo churn — clock versus cancel count

Logo churn asks how many paying accounts left in a period, as a start-of-period count. TTV asks how long until a remaining (or just-won) account reached first value. Gabe’s year-one note links the two — slow TTV is one typical cause of early logo loss — but they are not the same instrument. This page does not reproduce Gabe’s ICP / SMB / non-ICP Good / Better / Best tables. Those bands live on the logo-churn page.

TTV vs a retention curve — first outcome versus still-doing-it

A retention curve plots, for users who started together, the share still doing the core action at day or week N. TTV is the clock to the first named outcome that often precedes that curve. A 12-day median TTV does not tell you the week-8 flatten. A flatten at 35% does not tell you how long first value took. Keep the instruments on separate pages.

Worked example

Two clocks you can copy (illustrative — fictional)

The days below are illustrative. Names, product, and every figure in this section are invented so you can see a vanity “onboarding complete” checkbox next to a named first outcome. This is not a study, not an industry benchmark, and not a Yibud report. Copy the method, not the numbers.

The promise, written before the cohort is measured

Illustrative names: founder Kenji Sato at Inboxlane, a shared inbox for boutique agencies. Paying customers exist. The tempting trophy is a CS slide that prints “onboarding complete” when the setup wizard checkbox fires. The tripwire is written first, on 3 March: for agencies that signed in February, median TTV from account provisioned to first client reply sent from the shared inbox must stay ≤ 14 days — or we stop paid ads for that segment and cut onboarding scope to “send the first reply,” not “complete the workspace.” A Yibud score does not fire this line. The 14-day bar is a template they wrote, not Procore’s 30-day goal and not Gainsight’s 4-week launch pasted onto a twelve-person company.

Slide A — “onboarding complete” at day 5, first real outcome at day 45

Invented cohort: 20 agencies provisioned in February. The wizard checkbox (“workspace ready”) fires at a median of day 5 after provision. First client reply sent from the shared inbox — the named first outcome — sits at a median of day 45. The CS slide prints “median TTV is 5 days.” The dated tripwire asked for first reply ≤ 14 days. 45 misses 14. Calling the checkbox “value” is how a vanity TTV gets a budget.

The two clocks, kept honest

Same fictional book. Contract-to-provision median is 9 days (someone still grants seats by hand). Provision-to-first-reply median is 45 days. If they had started the clock at contract signed, the blended number would have been 54 days — and they still would not know which leak to fix. Write both clocks when both matter. Do not hide the 9-day queue inside “TTV is onboarding.”

What the tripwire does — and what must not happen

Honor the action they wrote: stop paid ads for agencies; cut the wizard to the first reply, not a twelve-step workspace. Do not rewrite the stop-clock to “checkbox ticked” after day 45 prints. Do not paste Procore’s 30-day first-value goal or Gainsight’s 4-week launch onto this fictional book and call the debate settled. Do not treat a later 12-day median as proof of product-market fit. Keep the next month on the same start, the same named outcome, and the same statistic.

Write the tripwire before the first cohort report. Show the start event, the named outcome, and the day-count. If the window closes and you missed the bar you wrote — or only “cleared” it after swapping the checkbox in — honor the action. Neither a 5-day vanity clock nor a Yibud score predicts success.

A dated vignette

Procore in Bessemer Atlas — first value 60→30, their numbers, their date

Bessemer Atlas, Gabe Miller-Smith (29 August 2023), used as written. At Procore, first value took 60 days; the goal was to cut that in half to 30 days. That is time to first value, not full value. This page does not invent today’s Procore metrics, does not treat 30 days as a law you must print this quarter, and does not copy Gabe’s logo-churn Good / Better / Best tables.

The 7-day access queue, then the rest of the clock

Manual provisioning took 7 days to give customers access. The fix they name: automate provisioning and add a setup wizard so customers can begin using and customizing right away. Role-based certification badges replaced generalized education that kept customers reliant on a CSM. A welcome drip to new admins covered the seven most important things. Later lifecycle drips included renewal prep 120 days out. Those are process changes Gabe reported — not a success certificate, and not a Yibud grade.

TTV cuts are a team sport — and year-one timing is one sentence

Gabe describes a cross-functional churn steering committee — product, engineering, sales, customer marketing — not a CS-only ticket queue. Year-one churn, in that same piece, often signals too much discounting at the outset or time-to-value too long. Years three and beyond often mean upsell / value delivery or a misunderstood segment, including a willingness to downsell. For logo-count bands and n lost / n start, use the logo-churn page. This page stops at the clock.

A second dated sitting

Gainsight’s time to launch — 13 weeks to 4, their framing of 66%

Ashvin Vaidyanathan (then CCO), “How We Decreased Time to Value At Gainsight By 66%,” 21 September 2020. Results in the piece are attributed to process changes implemented in Q1’21. Their metric is time to launch of the customer’s Gainsight implementation. That relates to a product-level first-outcome TTV — you cannot get a first live workflow if launch never happens — but it is not identical to “first campaign sent.” Present the title’s “66%” as Gainsight’s own framing of the 13→4 week drop. Do not invent a different percent.

What leaked, from 1000+ implementations

They analyzed learnings from 1000+ implementations. Three leakage themes: (1) demand for standard best-practice configurations; (2) customers want phased milestones instead of one big bang; (3) data integrations typically took 30–40% of total implementation time. Changes they name: a Configuration Wizard covering six common starting elements (CRM connector; key CRM data syncs; Customer View / C360; basic health scoring; starter CTAs and workflows; starter reports and dashboards); an optional agile / phased launch with out-of-box configs; and a growing connector and partner integration catalog.

13 weeks → 4 weeks; fastest lasting nine days

After those changes, average time to launch dropped from 13 weeks to 4 weeks. The fastest implementations lasted nine days. That is Gainsight’s operational clock on their implementation, dated to the Q1’21 process changes they describe. It is not a universal “good TTV is 4 weeks” law, and not proof that a 4-week launch means the customer reached a product-level first outcome.

Customer vignettes — their attributed results, their dates

Quoted as Gainsight’s attributed results in that 21 September 2020 piece: Omada Health expected at least two months, deployed a fully functional platform in four weeks (including Salesforce) and fully onboarded CSMs two weeks later. PandaDoc’s initial launch was 23 days. Malwarebytes was live in three weeks, including SFDC data, Timeline, and C360. Use those as labeled vignettes. Do not turn 23 days or three weeks into a grade table for every SaaS.

How to run it

How to run a TTV tripwire without faking scale

This is Yibud’s suggested sequence, not a Bessemer checklist and not a Gainsight implementation audit. Honor the tripwire you wrote before the first cohort report. If you cannot name the decision the day-count would change, you are building a slide.

  1. 1

    Write the tripwire before you look

    Name the as-of date, the segment, the start event, the named first outcome, the statistic (median or p75), the threshold in days, and the action (stop paid acquisition for that segment / automate provisioning / cut scope to a phased first launch / stop selling the segment). Date the page. Do not rewrite the bar after the cohort closes.

  2. 2

    Lock two clocks when both matter

    Provision delay is time from contract (or order) to access. Time-from-access is time from a usable login to the named first outcome. Gabe’s 7-day manual access sitting is why the split exists. If you only have one clock, say which start you used. Do not hide a queue week inside “median TTV.”

  3. 3

    Name one stop. Put n next to the day-count.

    First campaign sent. First dashboard with live data. First workflow live. Not “onboarded.” With a tiny cohort, write 8 / 12 reached first value by day 14 next to the median. Do not read a “median” from three customers. Do not swap the checkbox in after a miss.

  4. 4

    Read year-one cancels as a prompt, not as the clock

    Gabe: year-one churn often means discounting or time-to-value too long. If logos are leaving in year one and you have no named first outcome, you do not yet know which cause you are in. Bucket reasons on the logo-churn page. Use this page to name the clock those cancels might have missed.

  5. 5

    Honor the action. If you are pre-product, use a different instrument.

    If the cohort closes and you missed the bar you wrote, do the thing you named. Do not paste Procore’s 30-day goal or Gainsight’s 4-week launch in after the close so the slide clears. Pre-product or smoke-test phase: do not “optimize TTV” by starving discovery. Use interviews, willingness-to-pay, smoke tests, or kill criteria first. A Yibud score is not TTV.

What you leave with

The TTV tripwire (copy this)

If the sitting produced a day-count and no dated action, you did not finish. Fill the brackets. Leave nothing as “onboarding is fine,” “they clicked around,” or “we’ll know it when NRR arrives.”

The fill-in contract

Product: [name]. Segment: [ICP / SMB / other], written before the first cohort. As-of date: [day]. Hypothesis this clock can falsify: [this segment reaches a real first result fast enough that we can scale acquisition / keep selling this ICP]. Start event: [contract signed / account provisioned / first login — pick one]. Provision delay if you split clocks: [days from contract to access]. Named first outcome (stop clock): [first campaign sent / first live dashboard / first workflow live — not “onboarded”]. Statistic: [median / p75]. n who reached it / n in cohort: [ ]. TTV: [ ] days. Threshold: [e.g. median ≤ 14 days — a bar we wrote, not Procore’s 30-day goal and not Gainsight’s 4-week launch treated as a law]. Action if miss: [stop paid acquisition for this segment / automate provisioning / cut scope to a phased first launch / stop selling the segment]. Action if hold: [keep going / next cohort on the same definitions]. A Yibud score does not fire this line.

The day-count in the brackets is yours to write before you measure. Procore’s 60→30 and Gainsight’s 13→4 weeks are dated sittings, not permission to skip the named outcome, and not permission to treat a pass as success. Rewrite the threshold before you measure if you have a reason. Do not rewrite it after.

Example tripwire (Yibud’s suggested template, not a law)

If, for agencies provisioned in February, median days from account provisioned to first client reply sent is above 14 on 31 March → we do not 3× paid ads for that segment; we automate seat grants and cut the wizard to the first reply. Report n who reached first reply / n provisioned. Keep a second clock for contract-to-provision delay. Do not rename “workspace ready” as the stop after the close.

A 14-day median on one month is still one month. A Yibud report score does not fire this tripwire. If no one can yet reach an outcome, this template is the wrong first instrument — use a smoke test, willingness to pay, or interviews instead.

The fork

When to use a TTV tripwire — and when not to

The first-outcome clock is the wrong first instrument when nobody can yet use or pay, when you are still testing demand, or when you have not named “value.” It is the right instrument when a customer can reach an outcome and you are deciding whether onboarding is slow enough that you should stop scaling, fix provisioning, or cut scope.

Use it when someone can reach a named outcome and you are about to scale onboarding or ads

Paying or active users exist. You can name a start event and one observable first result. You are about to 3× a channel, tell yourself “onboarding is done because the kickoff happened,” or skip the provision queue because the wizard looks pretty. That is when a dated clock earns its keep. Optional: run logo churn, a retention curve, or NRR as separate sittings — do not average them into a homemade “onboarding score.”

Do not start here when you are pre-product or still discovering

No one can reach an outcome yet? There is no honest TTV. Do not invent a forecast day-count. Still writing a deposit, a smoke test, or a first interview batch? Those pages come first. Still writing Stop / Pivot / Continue? Those are the decision contracts. This page supplies one onboarding-clock instrument those contracts can later read. It does not replace them. A Yibud score is not TTV.

Not the same page

TTV vs logo churn, retention curves, NRR, vanity metrics, discovery, delivery MVPs, and decision contracts

Several Yibud pages sit next to this one. Mixing them up turns a cancel rate, a flatten, a dollar-retention %, or a waitlist into “TTV is 30 days, so scale.”

Later monetization of an already-activated free cohort — free-to-paid / trial-to-paid inside a named window — is a different instrument — SaaS trial-to-paid conversion.

The share of a named new-user cohort who reach that first value inside a named window — activation rate, not the clock — is a different instrument — SaaS activation rate.

Logo churn — how many accounts left, not how long first value took

That page owns account-count churn and Gabe’s ICP / SMB / non-ICP bands. It mentions Procore first-value 60→30 as a churn-fix vignette. This page owns the clock: start event, named first outcome, tripwire, and Gainsight’s time-to-launch sitting. A 12.5% logo rate does not tell you median TTV. A 12-day TTV does not tell you 3 / 24 left. Do not paste those band tables here.

Logo churn for startups →

Retention curve — still doing the core action, not time to first outcome

That page plots cohort usage over days. TTV is the clock to the first named result that often precedes retention. A flatten at 35% weekly logs does not tell you first value took 12 days. A 12-day TTV does not tell you the curve flattened.

Retention curves for startups →

NRR — dollar retention of a starting ARR base, not this clock

That page asks whether customers live at period start paid you more or less after churn, downsell, and expansion. TTV is a leading onboarding and CS lever that can feed later dollar retention. It is not NRR. A 110% NRR does not tell you first dashboard took 45 days.

SaaS NRR →

Vanity metrics — hygiene class; TTV fails when “value” is undefined

That page is the sorting hat: hits, cumulative sign-ups, and waitlist size feel like progress and do not tell you what to do next. A TTV chart whose stop-clock is “onboarding complete” or “attended kickoff” fails the same test. The day-count is only actionable when the first outcome is named.

Vanity metrics for startups →

Smoke, WTP, interviews, Ellis — demand instruments, not this clock

Those pages test reach, first money, coverage of needs, or stated disappointment. Pre-product and pre-usage teams should start there. Do not “optimize TTV” by starving discovery. TTV matters once someone can actually use or pay.

Concierge and Wizard of Oz — how you deliver, not how long first value took

Those pages are delivery methods: you do the job by hand, or the customer believes the product is automated. They can be how a first outcome happens before you have software. They are not a TTV tripwire. A one-week concierge does not tell you median TTV after you automate.

Kill and pivot — contracts that can read this clock

Those pages write Stop or rewrite one dimension. This page can supply the onboarding-clock instrument those contracts later read: a dated median or p75 to a named first outcome against a bar you wrote first. A 12-day slide with no named outcome cannot fire a kill line honestly.

Where Yibud fits

Neither TTV nor a Yibud score predicts success

Yibud is a free, no-signup startup idea validator. Scores come from a deterministic rule engine, not from a language model guessing success. Optional AI text, when it is used, only polishes prose. It does not invent the number. A Startup MRI report can name a weak onboarding, distribution, or retention assumption, then a Day-7 Continue / Refine / Re-test / Stop signal. The score is a flashlight on the weakest assumption to test next — not Time to Value, not logo churn, not a forecast. TTV work sits next to that assumption: write the tripwire, do not hope a 30-day slide means customers got a result. If you already have a report, start with the named assumption, not the overall score. Then run the cohort yourself. The method on this page stands alone if you never open the analyzer.

Analyze my idea →

Common mistakes

What usually wastes a TTV week

Leaving “value” undefined

If two teammates would score the same customer differently, you do not have a stop clock. “Successfully onboarded” is a mood. First campaign sent is an outcome. Write the named result before the first cohort.

Measuring only kickoff meetings

A kickoff is a start-adjacent event, not first value. Gabe’s old Procore path included kickoff plus formal implementation plus hours of training — that was the long road they were trying to leave. Counting meetings will make every clock look kind.

Copying Procore’s 30 days or Gainsight’s 4 weeks as universal law

Procore’s first-value goal was 60→30 days in Gabe’s 29 August 2023 sitting. Gainsight’s average time to launch moved 13 weeks → 4 weeks, fastest nine days, framed by them as 66%. Those are dated, attributed sittings. They are not a grade table for your seed book. Write your own bar. Do not treat a match as proof you will succeed.

Ignoring the provision queue

Gabe: manual access took 7 days. If you start at contract signed and never split provision delay from time-from-access, you will blame CS for an engineering queue — or miss a queue you could automate. Keep two clocks when both matter.

Optimizing TTV by forcing a fake first click

A forced tooltip click that does not correlate with later retention is a vanity stop-clock. The fictional “workspace ready” checkbox at day 5 while first reply sits at day 45 is that failure mode. If the named outcome would not show up on a retention curve later, you named the wrong stop.

Treating a hit tripwire as proof of product-market fit

Clearing a pre-written first-outcome clock means that cohort cleared a gate you wrote. It does not prove PMF, does not prove you will succeed, and is not a Yibud GO. Ellis’s very-disappointed question, a flatten, and willingness to pay are different sittings. Keep them on their own pages.

Sources

Where these ideas come from

  • Gabe Miller-Smith / Atlas Editors / Bessemer Venture Partners, “Understanding churn and building an action plan to fix the proverbial leaky bucket,” 29 August 2023 — Used for year-one churn often meaning too much discounting at the outset or time-to-value too long; years three+ often upsell / value delivery or a misunderstood segment, including a willingness to downsell; Procore time to first value 60 days → goal of 30; manual provisioning took 7 days; automate + setup wizard so customers can begin using and customizing right away; role-based certification badges versus generalized education that kept customers reliant on a CSM; welcome drip covering the seven most important admin things; later lifecycle drips including renewal prep 120 days out; and a cross-functional churn steering committee (product, engineering, sales, customer marketing). Logo-count bands are not reproduced here — they live on the logo-churn page.
  • Ashvin Vaidyanathan / Gainsight, “How We Decreased Time to Value At Gainsight By 66%,” 21 September 2020 — Used for learnings from 1000+ implementations; three leakage themes (standard best-practice configurations; phased milestones versus one big bang; data integrations typically 30–40% of implementation time); Configuration Wizard covering six starting elements (CRM connector; key CRM data syncs; Customer View / C360; basic health scoring; starter CTAs/workflows; starter reports/dashboards); optional agile / phased launch with out-of-box configs; growing connector / partner catalog; average time to launch 13 weeks → 4 weeks after Q1’21 process changes; fastest lasting nine days; “66%” as Gainsight’s own framing of that drop; Omada Health (expected at least two months; fully functional platform in four weeks including Salesforce; CSMs fully onboarded two weeks later); PandaDoc initial launch in 23 days; Malwarebytes live in three weeks including SFDC data, Timeline, and C360. Their metric is time to launch of the implementation, not a product-level first-outcome TTV.

In one paragraph

Summary you can quote

Time to Value (TTV) is elapsed time from a named start (contract, provision, or first login) to the first named, observable customer outcome — first value, not full value. It asks how long until they get a real result, not whether you will succeed. Write the tripwire before you look. Gabe / Bessemer Atlas (29 August 2023): year-one churn often means discounting or TTV too long; Procore first value 60→30 days; manual access 7 days; seven admin facts; 120-day renewal drip; TTV cuts are cross-functional. Gainsight (21 September 2020; Q1’21 changes): 1000+ implementations; integrations 30–40% of implementation time; average time to launch 13 weeks → 4 weeks (their “66%”); fastest nine days; Omada four weeks then CSMs two weeks later; PandaDoc 23 days; Malwarebytes three weeks. Their clock is time to launch, not a universal SaaS law. Matching the gate is a decision signal. Neither TTV nor a Yibud score predicts success.

FAQ

Questions founders actually ask

What is Time to Value for a startup?

Elapsed time from a named start event (contract signed, account provisioned, or first login / signup) to the first named, observable customer outcome. It is first value, not full value. It answers how long until they get a real result. It is not a success score, not logo churn, and not a retention curve. Write the bar before you measure.

What is a good Time to Value?

This page does not publish a universal “good TTV is X days” table. The dated sittings we cite: Gabe / Bessemer (29 August 2023), Procore first value 60 days with a goal of 30; Gainsight (21 September 2020), average time to launch 13 weeks → 4 weeks, fastest nine days, framed by them as 66%. Write your own tripwire for a named outcome. Do not copy 30 days or 4 weeks as law.

How is TTV different from logo churn and from a retention curve?

Logo churn is customers lost ÷ customers at period start — a count. A retention curve is the share of a cohort still doing the core action at day N — usage over time. TTV is the clock to the first named outcome. Gabe links slow TTV to year-one logo loss, but they are separate instruments. This page does not copy logo-churn band tables.

Should a pre-product founder optimize TTV?

No. If nobody can yet reach an outcome, there is no honest clock. Use interviews, a willingness-to-pay test, a smoke test, or kill criteria first. Once users can reach an outcome, write the tripwire for that outcome. Do not starve discovery to decorate a day-count.

Is a Yibud score the same as Time to Value? Does hitting 30 days predict success?

No and no. Yibud scores come from a deterministic rule engine on your idea inputs. They point at the weakest assumption to test next. They are not TTV, not logo churn, and not a forecast. Neither a 30-day first-value goal, a 4-week Gainsight launch, nor a Yibud report score predicts success. You do not need an account to use this page.

Write the first-outcome clock before you scale onboarding

Yibud scores weak assumptions with a deterministic engine. You write start event, named first outcome, statistic, threshold, and action while you are still honest — then a month of TTV is a tripwire, not a 5-day checkbox slide.

Generate a Yibud report →